PreFEED HAZID for Medco E&P Malaka Block-A, Aceh

Created on March 22, 2023

Following the success delivery of HAZOP Revalidation Study for the Medco E&P Block-A Gas Development Project Phase I & II, LebSolution is again trusted to facilitate the Pre-FEED HAZID Study for the Phase-III Gas Development, where several configurations of Gas Compression System are reviewed.

The Phase-III is to accommodate Medco mission to maintain its sales gas production for Indonesia national development, when the reservoir pressures has depleted.

The HAZID workshop conducted on 28Feb-1Mar 2023 (two days), attended by multidisciplinary team from Medco & Synergy Engineering (main contractor), and facilitated by LebSolution with Lukmanul Hakim as the Chairman and Deri Iryawan and Galang Ananta as the Scribe.

Thanks to both Medco and Synergy Engineering for their continuous trust in LebSolution in delivering their Process Safety agenda. We wish you all the best with the Phase-III program until its production.

Best Regards
LebSolution
www.lebsolution.com

#training #awareness #k3 #safety #powerplant #pln #lebsolution; #makpros; #processsafety; #processsafetymanagement; #riskmanagement; #hazop; #hazid; #pha; #riskassessment; #PSM; #projectsafetyreview; #prestartupsafetyreview; #majorhazards; #consequencemodelling; #competencymanagementsystem;

1 2 3 4


Explore other News